Pre - Engineering Steel Building For Salt factory

Pre-Engineered Steel Building

Client: Estama Trading plc
Sector: Salt Processing
Location: Samera City, Afar Regional State, Ethiopia
Project Type: Erection steel structure, Installation, Cladding, Final tightening
Duration: 6month (editable)

Phi Engineering executed the erection of a pre-engineered steel truss (PEB) roof system for Mery Sanitation Chemicals Manufacturing in Furi, Ethiopia. The existing factory concrete structure was already built, and the PEB roof components were fabricated by Kirby, ensuring high-quality steel and structural reliability.

The project provided a durable, wide-span roofing solution suitable for chemical manufacturing and storage operations, integrating seamlessly with the pre-existing reinforced concrete building.

Engineering and Execution

Design & Coordination: Phi Engineering verified the as-built concrete structure, conducted site surveys, and prepared erection methodology for the Kirby-fabricated PEB roof system.

Construction / Erection: Installed primary steel trusses, secondary members, purlins, and bracing, ensuring proper alignment, stability, and load transfer to the existing concrete structure.

Quality & Safety: All erection works were executed in compliance with approved drawings, technical specifications, and Ethiopian construction and safety regulations.

Gallery

Advancing Industrial Processing

The new Estama Trading Salt Factory enhances the region’s capacity to refine and distribute essential salt products as it scales operations to meet national market demands. By providing a modern, climate-resilient, and highly efficient structural environment, the facility works in tandem with local supply chains to maintain the industrial growth of Samera and the economic security of the Afar Regional State as a whole. PHI Engineering Solution, managing a project value of approximately ETB 65,000,000.00, surpassed all milestones for structural precision, rapid 6-month execution, and the seamless integration of industrial-grade Steel Fabrication technology.

Scope of Work

  • Verification of existing concrete structure and site layout
  • Coordination of Kirby-fabricated PEB roof system
  • Erection of primary steel trusses, secondary members, purlins, and bracing
  • Alignment, leveling, and structural stability verification
  • Implementation of erection safety and quality control measures
  • Project Highlights
  • Erection of pre-engineered steel truss (PEB) roof system on existing concrete factory
  • Steel components fabricated by Kirby
  • Wide-span roofing for chemical manufacturing operations
  • Integration with existing reinforced concrete structure
  • Compliance with Ethiopian construction and safety regulations